MassCEC will continue accepting applications to the Whole-Home Air-Source Heat Pump Pilot Program until June 25, 2021 or until all funding is committed
SEBANE National Electrical Code Training
Event Time:
Friday, February 26, 2021 - 9:00 AM to 4:00 PM
Event Location:
Virtual
See map: Google Maps
Event Contact
The Solar Energy Business Association of New England (SEBANE) invites all solar PV installers, and electrical and building inspectors to attend the most up-to-date training available on PV Systems and the 2020 National Electrical Code.
Join Matt Piantedosi, Senior Solar Energy Consultant at Ridgeline Energy Analytics, for an in-depth analysis of the 2020 National Electrical Code requirements for solar PV system installations in Massachusetts. Key code changes will be provided for sections pertaining to PV installations, including Articles 690 and 705, as well as services in Article 230, grounding and bonding in Article 250, and wiring methods in Chapter 3.
This informative one-day program will include two sessions (morning and afternoon), covering the following:
- Array, disconnects, inverter, and solar labeling requirements and updates
- Rapid shutdown review
- Chapter 11 of NFPA 1: Fire Code Review
- Interconnection and Article 705 requirements and calculations
- In-depth analysis of PV system grounding
- MA SMART Solar Program requirements and best-practices
Join SEBANE for both sessions on Friday, February 26th, or register for the one covering what you need. See the event agenda below for session topic breakdown. All attendees will receive national electrical code certification from North American Board of Certified Energy Practitioners (NABCEP) through Ridgeline Energy Analytics upon completion of the training.
Register
Event Agenda
9:00 am - Session I Begins
Session I Covers:
- Array, disconnects, inverter, and solar labeling requirements and updates
- Rapid shutdown review
- Chapter 11 of NFPA 1: Fire Code Review
12:15 pm - Lunch Break for Full Day Attendees, Session I Ends
12:45 pm - Afternoon Session Begins
Session II Covers:
- Interconnection and Article 705 requirements and calculations
- In-depth analysis of PV system grounding
- MA SMART Solar Program requirements and best-practices
4:00 pm - Session II Ends