Follow us on facebook Twitter Follow us on LinkedIn Follow us on Flickr Follow us on Youtube Follow us on our Blog Contact Us

MassCEC expects to pay the installation rebate within 45 days of receipt of a signed, complete Project Completion Form and all required backup documentation (and the completion of a post-installation audit, if required). The deadline for submission of this form is 30 days after the project is complete. Please note any changes to System Owner information or system details on the Change Request Form. MassCEC reserves the right to inspect or audit any system before or after remittance of the rebate payment.

Project Information
PAYMENT INFO
BackUp Documentation - REQUIRED
Please upload the following required pieces of backup documentation:

Allowed file types are Images(jpg, jpeg, gif, png), PDF PDF, ms word MS-Word and Ms Excel MS-Excel

Change Request Form (Only to be filled out if any information has changed since the time of application.)

Commonwealth Solar Hot Water Change Request Form - If Applicable
SYSTEM OWNER
COLLECTOR
To find the rating of your collector,
go to www.solar-rating.org
and click on "Certified Collectors
and Ratings".
COLLECTOR TYPE
RACKING TYPE
SYSTEM TYPE
OTHER COMPONENTS
For systems that are not OG-300 certified:
Installations must meet one of the following accepted freeze protection installation methods: (please specify)
Installations must meet one of the following accepted stagnation control methods: (please specify)
Additional Notes:
Disclaimer: Under no circumstances will MassCEC provide an adjusted rebate that is more than the originally approved rebate. Notwithstanding the foregoing, MassCEC reserves the right, at its sole discretion, to rescind the rebate or adjust the rebate amount in a manner proportionate to the changes from the approved Application.

Massachusetts, It's all Here
Powered by Getfused